Project Name: Unison Projects Commercial Air Conditioning
Location: Kawana
Client: Unison Projects
Scope of Work: Supply and install 2x new 40kW Actron Air AC units to new commercial tenancies.
Actron AC units roof mounted on purpose made galvanized roof brackets.
Ducting: the unit was installed with 600 x 400 mm square metal ducting coming off the front of the machine and penetrating through the roof sheet. Once inside the tenancy, the ducting transitioned into a 450mm round spiral duct for 18 metres, and then stepped down to a 300mm duct for 4 metres.
Side blow registers were installed every 3 metres down the duct work blowing out at 9 o’clock and 3 o’clock positioning.
Roof mounted Actron air condensing units, galvanized steel roof brackets.
Square metal ducting 600 x 400 mm penetrated through the roof sheet
Metal duct transition from 600 mm square ducting to 450 mm round spiral duct.
Side blow registers installed every 3 metres.